Mon. Sep 26th, 2022

Starting tonight, Monday, June 14 through Saturday, June 19, 2021, Metrolink will be inspecting and maintaining the railroad track system in Santa Ana between 8 p.m. and 4:30 a.m.



If needed, crews will repair equipment. Even within Quiet Zones, this work could lead to:

• Possible Train Horns
• Noise
• Light from maintenance vehicles or activities

No delays at the railroad crossings or for passenger train service are anticipated.

Questions and concerns may be directed to Metrolink’s Community Relations hotline at (213) 452-0433 or to communityrelations@scrra.net.

El trabajo de mantenimiento de los rieles de Metrolink comienza esta noche

Spanish/español: https://bit.ly/3gwIl0j

Vietnamese/Tiếng Việt: https://bit.ly/3pSitjy

By Editor

Art Pedroza started Orange County's first political blog, the Orange Juice, back in 2003. He now publishes the top civic blog in Orange County - New Santa Ana, plus other blogs including New Anaheim, New Fullerton and the Irvine News Blog, as well as the OC Politics Blog.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.