Wed. Dec 18th, 2024

Starting on Monday, June 21 through Saturday, June 26, 2021, Metrolink will be inspecting and maintaining the railroad track system in Santa Ana between 8 p.m. and 4:30 a.m.

If needed, crews will repair equipment. Even within Quiet Zones, this work could lead to:

• Possible Train Horns
• Noise
• Light from maintenance vehicles or activities

No delays at the railroad crossings or for passenger train service are anticipated.

Questions and concerns may be directed to Metrolink’s Community Relations hotline at (213) 452-0433 or to communityrelations@scrra.net.

Translations:

Trabajo de mantenimiento de los rieles de Metrolink del 21 al 26 de junio

Español 

Công việc bảo t

Tiếng Việt

author avatar
Art Pedroza Editor
Our Editor, Art Pedroza, worked at the O.C. Register and the OC Weekly and studied journalism at CSUF and UCI. He has lived in Santa Ana for over 30 years and has served on several city and county commissions. When he is not writing or editing Pedroza specializes in risk control and occupational safety. He also teaches part time at Cerritos College and CSUF. Pedroza has an MBA from Keller University.

By Art Pedroza

Our Editor, Art Pedroza, worked at the O.C. Register and the OC Weekly and studied journalism at CSUF and UCI. He has lived in Santa Ana for over 30 years and has served on several city and county commissions. When he is not writing or editing Pedroza specializes in risk control and occupational safety. He also teaches part time at Cerritos College and CSUF. Pedroza has an MBA from Keller University.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.