Santa Ana Bl. streetcar construction starting on 9/28

Construction crews will begin preparation work to install the future tracks for the OC Streetcar. For the safety of travelers and crews, lane and parking closures will be in place. Access to businesses and residences will be maintained at all times.

Work will begin as early as Monday, September 28, 2020. Construction schedules may be subject to change.

The project will take place on Santa Ana Boulevard from Parton Street to Mortimer Street, the following traffic controls will be in place for the duration of the work:

  • Closure of two lanes on the south side of Santa Ana Boulevard, one lane will remain open on the north side of the street
  • Partial intersection closure at Santa Ana Boulevard and Sycamore Street, only right-hand turns from the southbound direction will be permitted
  • Partial intersection closure at Santa Ana Boulevard and Bush Street, only right-hand turns from the southbound direction will be permitted

Please note that intersections along the work area will be subject to future closures. For up to date information regarding traffic controls and closures, follow us on Facebook, Twitter and Instagram or download the OC Streetcar app, available in the App Store and Google Play.

For any questions about the OC Streetcar project, please contact OCstreetcar@octa.net or (844) 746-6272.

Aviso De Construcción-Santa Ana Boulevard

(NOTA: La siguiente información fue proporcionada por el Orange County Transportation Authority.)

QUE: Los equipos de construcción comenzarán los trabajos de preparación para instalar las futuras vías del OC Streetcar. Para la seguridad de los viajeros y los equipos de construcción, se cerrarán carriles y estacionamientos. Se mantendrá el acceso a los hogares y negocios en todo momento.

CUANDO: El trabajo iniciará tan pronto como el Lunes, 28 de septiembre, 2020. Los horarios de construcción pueden estar sujetos a cambios.

DONDE: Los siguientes controles de tráfico estarán vigentes en Santa Ana Boulevard, desde Parton Street hasta Mortimer Street, mientras dure el trabajo de construcción:

  • Cierre de dos carriles en el lado sur de Santa Ana Boulevard; un carril permanecerá abierto en el lado norte de la calle
  • Cierre parcial de la intersección en Santa Ana Boulevard y Sycamore Street; solo se permitirán giros a la derecha desde el sur
  • Cierre parcial de la intersección en Santa Ana Boulevard y Bush Street; solo se permitirán giros a la derecha desde el sur

Tenga en cuenta que las intersecciones a lo largo de la zona de trabajo estarán sujetas a cierres en el futuro. Para obtener información actualizada sobre controles de tráfico y cierres, síganos en Facebook, Twitter e Instagram, o descargue la aplicación de OC Streetcar, disponible en la App Store y Google Play.

Para cualquier duda o pregunta sobre el proyecto de OC Streetcar, por favor envíe un correo electrónico a OCstreetcar@octa.net, o llame al (844) 746-6272.

Art Pedroza Editor
Our Editor, Art Pedroza, worked at the O.C. Register and the OC Weekly and studied journalism at CSUF and UCI. He has lived in Santa Ana for over 30 years and has served on several city and county commissions. When he is not writing or editing Pedroza specializes in risk control and occupational safety. He also teaches part time at Cerritos College and CSUF. Pedroza has an MBA from Keller University.
Art Pedroza

Our Editor, Art Pedroza, worked at the O.C. Register and the OC Weekly and studied journalism at CSUF and UCI. He has lived in Santa Ana for over 30 years and has served on several city and county commissions. When he is not writing or editing Pedroza specializes in risk control and occupational safety. He also teaches part time at Cerritos College and CSUF. Pedroza has an MBA from Keller University.

Share
Published by
Art Pedroza

Recent Posts

Tilly’s Life Center raised over $500K to support youth programs, at their annual O.C. gala

Tilly’s Life Center’s (TLC) recently raised over half a million dollars to support their youth…

1 hour ago

A small plan crashed near the Fullerton Airport this afternoon

On November 25, 2024, at approximately 1:46 PM, Fullerton Fire and Police personnel responded to…

2 hours ago

Firefighters had to extricate victims from two car crashes in Garden Grove last Friday

OCFA fire crews responded to two significant vehicle accidents in Garden Grove last Friday, requiring…

6 hours ago

An SUV was totally wrecked after hitting two light poles and a tree in Newport Beach

On November 24th, 2024, at approximately 1:00 a.m. Newport Beach Fire Department units NE63, NT63,…

9 hours ago

The SAPD arrested a man suspected in an armed robbery at a gas station

‼️UPDATE‼️ Earlier today, our robbery detectives arrested November 20, 2024, #WantedWednesday suspect Izaya Cuellar (35)…

23 hours ago

Driver arrested for destroying the lawn of a Costa Mesa park while doing donuts with his vehicle

Late Friday night, police officers responded to Balearic Park regarding a vehicle doing “donuts” on…

23 hours ago

This website uses cookies.